2024 Golf Course Renovation
RESTORATION OF GREENS TO ORIGINAL SIZE
REPLACEMENT OF ALL GREENSIDE IRRIGATION HEADS
FULL REGRASSING OF ALL FAIRWAYS AND PRIMARY
ROUGH WITH BIMINI BERMUDA GRASS
FULL RENOVATION OF ALL BUNKERS WITH ADDITION AND REMOVAL AS RECOMMENDED
FULL REGRASSING OF ALL TEE COMPLEXES WITH ADDITION OF SOME NEW TEES
REPLACEMENT OF SEAWALLS ON HOLES #6 AND #7
REPLACEMENT OF CART PATHS
Renovation Updates
Renovation Updates
Renovation Updates
Renovation Updates
Renovation Updates
DESIGN CONSULTANT
* * *
GARY KOCH
SIX-TIME PGA TOUR WINNER
COURSE CONSTRUCTION
* * *
GOLF SCULPTORS
INTERNATIONAL (GSI)
Hole 6
The fairway bunker on the right will be repositioned farther down the hole. Moving the green closer to the water will make the hole a true risk-reward par 5. For those playing a third shot into the green, mounding on the front left will help funnel the ball onto the putting surface.
Hole 9
The green complex will be reduced to two levels from three with a gradual slope between the two. Each level will be large enough to accommodate multiple hole locations. The left greenside bunker will be removed, creating a low chipping area that will be maintained at fairway height.
The two right greenside bunkers will be repositioned to create more room to enter and exit the green from the cart path.
Hole 11
This hole will become the only one on the golf course without a bunker as both at the green will be removed. The green will be angled slightly from left to right with the left side being high. To the right of the green will be a series of hollows maintained at fairway cut, providing the chance to play a variety of shots.
Hole 17
The green will be expanded to the right for a better relationship with the existing bulkhead and water. A new bunker on the front right will make hole locations on the right side of the green a little more challenging.The two right greenside bunkers will be repositioned to create more room to enter and exit the green from the cart path.